Seconity
Mechanical and plant engineering

Variant diversity is your strength. It must not be a source of chaos.

Lot size 1, long lead times, complex job site assembly: Seconity eliminates manual steps, provides real-time visibility for every order, and delivers the data foundation for on-time planning โ€“ from goods receipt to final acceptance.

Industry specifics

Your production isn't a line. That's exactly why it needs real time.

Mass producers cycle. Equipment manufacturers coordinate: Orders move across assembly stations, every machine is unique, and the material flow follows no fixed layout. In this environment, manual bookings and paper routing sheets are not just expensive โ€“ they are structurally overwhelmed.

Moving orders.

The order moves through shop floors and assembly stations โ€“ where it is right now is only known by whoever saw it last.

Provided materials and subcontracting.

Parts leave the plant and come back โ€“ or fail to return on time. Transparency ends at the gate.

On-time delivery as a contractual risk.

Penalties make every missed deadline a financial event. Early warning is missing.

Assembly searches instead of assembling.

Fixtures, small parts, and drawings: Search times per shift add up particularly fast in large facilities.

โ€žWe reduced manual scanning effort by over 70 percent. SAP postings now happen automatically when containers move."
โ€” Head of Intralogistics, Top 30 European machinery manufacturer
โˆ’70% scanning effort ยท โˆ’160 shift hours/month in reference plant ยท Payback 6โ€“14 months

Where is Order 4711? If the answer is a phone call, we should talk.